This is the next room to receive the Au Bellefleur treatment



A couple of shots of the next room to be converted into an en-suite bedroom, we had planned this room to be our summer bedroom but the way things are going it is turning into a good letting room, we will just have to see what the finished article looks like. It is just waiting for the builders to start work in September, and all things being equal it should be ready for occupation at the end of September. It should cost us a lot less than room one as we have so much stuff left over from the build of room one it will almost complete room two with just a 'few' extra bits. Sadly this room will not have any exposed stonework, due to the set up of the room, one stone wall has to be covered and water proofed for the bathroom and the other has all the electrical distribution boards on it, so this will have to be made safe from prying little fingers with a lockable cupboard.